Manual Compressed Earth Block Press

A hand-built compound-lever press that turns local soil into load-bearing building blocks for about the price of a bag of cement.

A manual lever block press being worked on site, with pressed blocks curing behind
Photo: ProjetQuisqueya · CC BY-SA 4.0. Reference photo of a comparable build, not the exact plan below.
Estimated cost
$30 – $60 in materials
Skill level
Intermediate
Time
2 – 3 days to build, then ~300 blocks/day with three people

Why this is a Verified Build

Two builds confirmed with photo proof: a five-lever press in Kajiado County, Kenya (2025) and a bolted timber version near Tamale, Ghana (2026). Both reported blocks passing a 24-hour water immersion test at 8% cement.

Tools

  • Handsaw or circular saw
  • Brace and bit or power drill with 16 mm wood bit
  • Adjustable spanner set
  • Tape measure, square and pencil
  • Chisel and mallet
  • Shovel, hoe and wheelbarrow
  • Screen or sieve (6 mm mesh)

If you don't have it

  • No lever press? Hand-tamp the same soil-cement mix in a bottomless timber mould with a 4 kg wooden rammer. Blocks come out weaker, so lay them in single-storey walls only and keep the mix at 8 – 10% cement.
  • No cement? Stabilise with 6 – 8% hydrated lime instead and cure for 28 days, or leave it as plain adobe and protect the wall with a wide roof overhang and a raised plinth.
  • No welder for the frame? Bolt the frame from 100 × 50 mm hardwood with 12 mm coach bolts and steel strap at the pivot. Expect to re-tighten the bolts every few hundred blocks.

Materials

  • Dimensional hardwood: roughly 12 m of 50 × 150 mm and 6 m of 50 × 100 mm
  • 1 × 16 mm (5/8") × 250 mm bolt with nut and 2 washers (main pivot)
  • 3 × 12 mm (1/2") × 150 mm bolts with nuts and 6 washers
  • 5 × 12 mm (1/2") × 250 mm bolts with nuts and 10 washers
  • Steel plate offcut, 6 mm, for the mould face and tamping plate
  • Sub-soil with 15 – 30% clay content (no topsoil, no organic matter)
  • Cement or hydrated lime for stabilising, 5 – 10% by volume
  • Used engine oil or vegetable oil as mould release

Dimensions & cut list

A lever-arm block press producing standard interlocking blocks for a single-storey wall. These are the reference sizes from Open Source Ecology / Engineers Without Borders — scale them to what you have, but keep the ratios.

Block size29 × 14 × 10 cmTwo blocks lay the wall thickness of a 29 cm wall
Mould fill volume≈ 1.5 × finished block heightSoil compresses roughly a third under the lever
Lever arm length1.5 m from pivotShorter arm means a weak block; longer bends the frame
Soil mix70% sand-rich subsoil, 30% clay-rich soil
Cement stabiliser5–8% by volume8% for plinth courses and wet zones
MoistureDrop test — a squeezed ball holds shape and breaks clean when dropped from waist height
Curing7 days damp under plastic, 21 days in shade before laying

Take this list to the yard

  • ≈ 90 blocksBlocks per 50 kg cement bag at 6%
  • ≈ 1.2 m³Screened subsoil per 100 blocksSieve out anything over 5 mm and all organic matter
  • 4 × 5 mPlastic sheet for curing
  • 1 eachWheelbarrow, hoe, 5 mm sieve

Step by step

Step 1 of 8

1

Test your soil first

Three jars showing sand, silt and clay separating out of a soil sample, next to a rolled soil ribbon
DrawingFollows CRATerre / Auroville Earth Institute field soil identification tests. Africa Fab Lab

Do a jar test: fill a clear bottle one-third with sub-soil, top with water, shake, and let it settle overnight. You want roughly 15 – 30% clay over a sand layer. Too much clay cracks; too much sand crumbles. Adjust by mixing in clean river sand or clay-rich soil from another pit before you build anything.

Swipe or use arrow keys

Why mine failed

The ways this build usually goes wrong, and what fixes it.

  • Blocks crumble at the edges when lifted off the press

    CauseMix too dry, or too little clay to bind the sand

    FixDo the drop test on every batch: a squeezed ball must break clean, not powder. If it still crumbles, add clay-rich soil in small increments rather than more water.

  • Blocks slump and lose their shape

    CauseToo wet — water, not compaction, is filling the mould

    FixSpread the mix in the shade for 20 minutes and re-test. Never pour water straight into the mould box.

  • Faces crack in the first two days of curing

    CauseDrying in sun and wind before the cement has set

    FixStack and cover with plastic within an hour of pressing, keep damp for 7 days, then air-cure in shade for three weeks.

  • Blocks soften in the rain after the wall is up

    CauseCement content too low, or no plinth and no overhang

    FixGo to 8% cement for the bottom three courses, keep blocks 30 cm clear of the ground, and give the roof a 60 cm overhang.

Safety notes

  • The lever stores real energy. Keep hands and heads clear of the arc, and never leave the arm raised unattended.
  • Cement is caustic. Wear gloves and eye protection when mixing dry, and rinse skin contact immediately.
  • Dry soil screening produces silica dust — work upwind or wear a dust mask.
  • Do not use a compressed earth block wall to carry a heavy roof without a ring beam and, in seismic zones, an engineer's review.

Source & attribution

This plan is our build-step write-up of work documented by Open Source Ecology / Engineers Without Borders. The original design and documentation belong to them — go read the source before you build.

CEB Press build plans and manual press dimensioned drawings

Local adaptations

What builders changed to make this work where they live.

  • Amina O. · Tamale, Ghana

    Hardwood was scarce, so we used 60 mm reclaimed truck decking for the uprights and doubled the pivot washers. Still pressing after 4,000 blocks.

  • Joseph M. · Kajiado, Kenya

    Our laterite needed a third river sand or the blocks cracked while curing. Do the jar test — it saved us a whole wasted week.

Send it through the form